Septage Collection Scheme
Expected Year of Collection ZONE* Number Covered Barangay
2018 Zone 1
  • Hinukay
  • Paitan
  • San Roque
  • Piel
  • Sto. Niño
  • Tangos
  • Sulivan
  • Tilapayong
  • Catulinan
  • Calantipay
  • Matangtubig
  • Pinagbarilan
2019 Zone 2
  • Pagala
  • Concepcion
  • San Jose
  • Virgen Delas Flores
2020 Zone 3
  • Barangka
  • Sabang
  • Subic
  • Tibag
2021 Zone 4
  • Bagong Nayon
  • Sto. Cristo
  • Poblacion
2022 Zone 5
  • Tarcan
  • Makinabang
  • Sta. Barbara
  • Tiaong

Amended Desludging Policy

As per Board Resolution No. 15, Series 2014
March 18, 2014

  1. A BWD concessionaires with minimum of two (2) years active service connection can avail the service.
    • A BWD concessionaires that was temporarily disconnected for a period of one (1) to two (2) months can also avail the services as per regular schedule.
    • A BWD concessionaires that was temporarily disconnected for a period of three (3) months can avail the service only after acquiring six (6) months active service connection before the desludging date as per regular schedule.
    • A BWD concessionaire that was permanently disconnected can avail the service after acquiring one (1) year active service connection before the desludging date as per regular schedule.
  2. Regular desludging service cycle is every five (5) years. In cases that septic tank is overflowing a concessionaire may request for desludging services through the Customer Service Section subject for approval by the management.
  3. The concessionaire may opt to allow BWD personnel to open their septic tank provided that the concessionaire waives the liability/ responsibility of BWD in case of damage to property.
  4. BWD concessionaires who already avail of the desludging service may still request for another desludging service before the five (5) year-cycle, however, they will have to pay Php 1,500 per cubic meter as desludging fee.
  5. Non-BWD concessionaires within the franchise area only, can also avail the service subject to availability of schedule with applicable assessment fees (minimum of Php 2,500 per cubic meter).
  6. Requests shall be on a “FIRST COME, FIRST SERVE” basis.